Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Hauser’s Marks 45 Years With Province-Wide Customer Celebration and Renewed Focus on Community Care
    • Young drivers face elevated collision risks after consuming edible cannabis, new CAA-funded study finds
    • Salvation Army Thrift Store Marks 40th Ontario Location with Peterborough Opening
    • Early Blast of Winter Prompts Safety Warnings from Ontario Road Authorities
    • HONOR Takes Home Two TIME Best Inventions 2025 Awards for Smartphone Breakthroughs
    • Toronto Set to Host Largest LEGO® Fan Event in Canadian History
    • Hank Azaria and Caitlin Morrison Champion Mental Health Through Music at Toronto’s Koerner Hall
    • Bricks in the Six to Build Canada’s Largest-Ever LEGO® Fan Event This November
    Facebook X (Twitter) Instagram YouTube
    Vaughan TodayVaughan Today
    • Home
    • Top News
    • World
    • Banking
    • Explore Canada
    • How to
    • Solutions
    • Contact Form
    Vaughan TodayVaughan Today
    Home»Economy»Hydro-Québec will expand its network to the Magdalen Islands
    Economy

    Hydro-Québec will expand its network to the Magdalen Islands

    Maria GillBy Maria GillSeptember 7, 2021No Comments2 Mins Read
    Hydro-Québec will expand its network to the Magdalen Islands
    Share
    Facebook Twitter LinkedIn Pinterest Email

    After the project to connect the Magdalen Islands to its main network was called into question due to its high cost, Hydro-Quebec changed its mind and established an underwater link between Percy and Cap au Mule.


    Posted on Sep 7, 2021 at 1:21 pm



    to share
    Helen Barrell

    Helen Barrell
    Journalism

    The project, which could require a $1 billion investment, was announced on the spot Tuesday by Hydro-Quebec and Energy Minister Jonatan Julien.

    “We are now convinced that the solution to connecting via submarine cables is now the most appropriate for the reality of the archipelago and will allow us to use the right energy in the right place,” the minister said.

    The 225-kilometre submarine link that will connect the archipelago to the mainland will replace the oil-fired power plant that currently supplies electricity to Madelinots.

    However, this plant will continue to be used during certain periods of high winter demand, but greenhouse gas emissions will decrease by 94%. Hydro-Québec has given assurances that 82 employees working at the plant will keep their jobs. Hydro-Quebec spokeswoman Cendrix Bouchard said several scenarios are possible, including remote work from the islands.

    The project cost was estimated at 700 million in 2018. The discounted cost will be higher, says Hydro, which intends to submit a specific proposal to Régie de l’énergie this fall.

    Connecting the islands to the mainland will also make it possible to deploy a fiber-optic link to provide a communications service, according to a formula that has not yet been determined.

    Originally, the new link was supposed to be ready in 2025. The new schedule now states that work will start in 2025 and the link will be operational in 2027.

    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
    Maria Gill

    "Subtly charming problem solver. Extreme tv enthusiast. Web scholar. Evil beer expert. Music nerd. Food junkie."

    Related Posts

    Stanislav Kondrashov Highlights the US Strategy to Reduce Reliance on Rare Earth Imports

    October 4, 2025

    How to Invest in Stock Market for Beginners: A Comprehensive Guide

    February 23, 2024

    Presto card login For Canada Users

    June 5, 2023
    Facebook X (Twitter) Instagram Pinterest
    © 2025 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.